Adding 783 kWh of battery storage to a solar-powered factory in Toluca, Mexico

Written by
2
min read time
November 25, 2026

Customer background

Our customer is a solar project developer and EPC based in Mexico, delivering commercial and industrial energy projects for major manufacturers and infrastructure operators. This BESS project is the fourth project they have delivered with Odyssey, and the second for the same end client: a global manufacturer whose plant in Toluca already runs on a solar PV system the customer installed, also procured through Odyssey.

The challenge

After successfully delivering the plant's solar PV system, the customer won a follow-on contract to supply, install, commission and operate a battery energy storage system (BESS) at the same site. The end client's standard policy is to pay suppliers net 60 days after project completion, so the customer needed to fund the full equipment purchase upfront and carry that cost through a six-week build and a further two-month payment term. Tying up that much working capital in a single project would have limited their ability to keep other projects moving.

How Odyssey helped

Odyssey provided construction credit to cover the project's equipment, with Odyssey paying the suppliers directly so the equipment could be delivered straight to site. Having already worked with the customer on the plant's PV system, Odyssey was able to move quickly: the customer's funding request came in July of 2026, and the deal moved through credit review that same month.

The equipment was sourced locally and was already in stock with suppliers that Odyssey and the customer had worked with before, avoiding import lead times. 

In October of 2026, the end-client asked to increase project size to a total of 5 BESS at 261 kWh each, which Odyssey was able to approve procurement for all necessary components in under one week. 

Equipment procured and project details  

  • Batteries: 261 kWh Hoymiles battery systems, supplied through local distributor Solar Center
  • Transformer: 639 kVA transformer from RTE Transformadores Eléctricos
  • System size: 375 kW / 783 kWh BESS
  • Location: manufacturing plant in Toluca, State of Mexico
  • Purpose: peak shaving and backup power, complementing the plant's existing solar PV system
  • Build timeline: approximately six weeks of project execution

The client impact

  • A bigger scope with an existing client: the customer turned a completed solar installation into a follow-on storage contract, growing its relationship with a global manufacturer without stretching its own balance sheet.
  • Solar plus storage for the plant: 783 kWh of storage now sits alongside the site's solar PV, giving the plant peak shaving and backup power.
  • Fast delivery: locally stocked equipment and a six-week build schedule, with no interconnection risk because the site already has an operating PV system.
  • A repeat partnership: as the customer's fourth project with Odyssey, the deal shows how a trusted procurement and financing partner helps an EPC build a stronger pipeline, project after project.

‍